jim
The bridge section is two thirds done, after this the bow section with the hooks and chains to do and about two to three days of touch up work. Then rigging
The mast has already been done, I have used this for a soldering demo along with making railings and fenders out of wire.
A good way to make fenders is to use the platt wire out of the coax cable. Cut it into short lengths and solder a small ring on to it and pack it out with cotton wool painted first. Then gather the bottom together and close it with a dab of solder. Then paint the whole thing a bamboo colour.
Barry Carley floats :?: :?:
Regards
Rob
The bridge section is two thirds done, after this the bow section with the hooks and chains to do and about two to three days of touch up work. Then rigging
The mast has already been done, I have used this for a soldering demo along with making railings and fenders out of wire.
A good way to make fenders is to use the platt wire out of the coax cable. Cut it into short lengths and solder a small ring on to it and pack it out with cotton wool painted first. Then gather the bottom together and close it with a dab of solder. Then paint the whole thing a bamboo colour.
Barry Carley floats :?: :?:
Regards
Rob