Good morning folks
I was still moving stuff out of the way of the new dryer which I am sitting here waiting to be delivered as I type. I did glue some more pink foam in the gaps. I also played around with the track layout again. I started figuring out the Power Plant Spur. Also I think I finally figured out how to add an off layout interchange track. It will require removing and replacing some of the foam however to extend the useable area of the layout. The mountain may not be as large as originally planned as I may have also figured out a place for the cannery.
How did you find out about the Gauge? I belonged to another forum that was shut down due to a rather nasty flame war. AT that time I only belonged to that forum and Atlas. Several members of the closed forum posted on Atlas that they were going to the Gauge. I followed and have been here ever since.
I was still moving stuff out of the way of the new dryer which I am sitting here waiting to be delivered as I type. I did glue some more pink foam in the gaps. I also played around with the track layout again. I started figuring out the Power Plant Spur. Also I think I finally figured out how to add an off layout interchange track. It will require removing and replacing some of the foam however to extend the useable area of the layout. The mountain may not be as large as originally planned as I may have also figured out a place for the cannery.
How did you find out about the Gauge? I belonged to another forum that was shut down due to a rather nasty flame war. AT that time I only belonged to that forum and Atlas. Several members of the closed forum posted on Atlas that they were going to the Gauge. I followed and have been here ever since.