I repainted the backdrop with a nicer blue, the added a grey horizon. I spray painted a cinnamom color, and will add more fall colors & details when holidays are over. The size is 11' x 10', DC, with 2 mainlines (single track over port perry bridge). Although the southbound mainline was ripped up in 1991, I am modeling the present with both mains, and original URR paint. 70% of the buildings are scratchbuilt from styrene.
This is looking at the Edgar Thomson works. The steel mill & rolling mill is walthers, but the large building and small office are all styrene, and modeled from photographs.
This is looking at the Edgar Thomson works. The steel mill & rolling mill is walthers, but the large building and small office are all styrene, and modeled from photographs.