I have my mainline in service, although I need to redo one of the curves. No scenery is even begun, as I need to build the frames underneath first, and transfer the track/roadbed assembly onto it.
I definitely regard myself as preparing for a future layout. I haven't run a train in, maybe, 6 months. I have numerous projects under construction, mostly rolling stock. Some of the equipment is too large for the tight curves on my current layout...since I'm building them for a layout that won't be started for 5-10yrs.
Now, for the past few months, I've been more of an armchair modeler. The last thing I did was build a set of trucks a couple weeks ago.
I definitely regard myself as preparing for a future layout. I haven't run a train in, maybe, 6 months. I have numerous projects under construction, mostly rolling stock. Some of the equipment is too large for the tight curves on my current layout...since I'm building them for a layout that won't be started for 5-10yrs.
Now, for the past few months, I've been more of an armchair modeler. The last thing I did was build a set of trucks a couple weeks ago.