This will be my first build thread on this forum and I've decided to continue on a build I started over a year ago and have had on the backburner as it is quite an intimidating build for me, but also why I started it initially. To me this build encapsulates the insanity of uhu02 to have such a detailed build down to labeling nearly every single component in the lunar lander. The following pictures are where I had stopped and will be starting back up at:



Yesterday I worked on the outer ring of the second half of the cockpit, the final modules for that ring, and the optical telescope that will go into it.



I got the ring assembled and got it to fit onto the other half of the module. It required a little bit of trimming to get it to fit snuggly and for the gaps to line up properly.


This was work I did yesterday and documented but was having trouble posting and I'll most likely post another update if I get more done tonight.



Yesterday I worked on the outer ring of the second half of the cockpit, the final modules for that ring, and the optical telescope that will go into it.



I got the ring assembled and got it to fit onto the other half of the module. It required a little bit of trimming to get it to fit snuggly and for the gaps to line up properly.


This was work I did yesterday and documented but was having trouble posting and I'll most likely post another update if I get more done tonight.