Just out of curiousity Shamus -
I seem to remember you mentioning that you used Peco track. (I know I spotted a Peco wye in that last shot)
Do you use the "Streamline" code 75? (whatever it is, your trackwork looks SUPER!)
I'm wanting to use this on my HO layout. I'm at present re-laying the track on my N scale layout, using Peco code 55. I've thrown out the handlaying gadgets, & the Micro-Engineering crap, & am not looking back, thanks to this wonderful product from the U.K. (y'all sure know how to do things right!)
I'm serious, whatever model railroading I do from now on, it's going to be with Peco track, & those wonderful turnouts!
Thanks again for sharing your wealth of knowledge with us Shamus. I think we've all learned a lot. Keep up the good work!