- Apr 5, 2013
- 13,876
- 10,214
- 228
@wulf111, are you using control points to trace the outline, or something else? The Control Point method is laborious. After spending 3 to 4 hours with their ( Cameo Silhouette) engineers, only to find out I had a defective machine, I was sent a new one, I cut one model, and never touched it again.