Guys,I am thinking about building this 2x4 foot layout since I can easily set it up and take it down.I gotta find something to keep me occupied.
However I plan on making some changes.
1.Eliminate the bottom crossover crossover and both switches since they have no real reason to be there.
2.Cut the yard from 4 to 3 tracks.
3.Eliminate the engine service track and engine house
4.Use smaller industries and use 2 on each industrial track.
Improvements.
1.Use the bottom track as a interchange and run around.
After thought.
I could leave the bottom cross over and place a industry there.
Any thoughts/comments?

However I plan on making some changes.
1.Eliminate the bottom crossover crossover and both switches since they have no real reason to be there.
2.Cut the yard from 4 to 3 tracks.
3.Eliminate the engine service track and engine house
4.Use smaller industries and use 2 on each industrial track.
Improvements.
1.Use the bottom track as a interchange and run around.
After thought.
I could leave the bottom cross over and place a industry there.
Any thoughts/comments?