Well I guess I've got first kick at the can today.
I spent most of my spare time this past week building the roadbed for my short narrow gauge line.
This weekend will have me doing:
Finally finishing off the warehousew building. All it needs are the wall caps ans sign (might not get the sign done)
Re-decorating a boxcar for my MR club.
laying the last 1 1/2' of standard guage track onto the logging section
working on my scenery elevations for the narrow guage section.
Run a train
scratch build a tunnel portal
Oh yeah and I've got to:
Mow the lawn
wash the car
buy insurance for the summer car
return some auto ramps to my in-laws
Could I buy another day?
I spent most of my spare time this past week building the roadbed for my short narrow gauge line.
This weekend will have me doing:
Finally finishing off the warehousew building. All it needs are the wall caps ans sign (might not get the sign done)
Re-decorating a boxcar for my MR club.
laying the last 1 1/2' of standard guage track onto the logging section
working on my scenery elevations for the narrow guage section.
Run a train
scratch build a tunnel portal
Oh yeah and I've got to:
Mow the lawn
wash the car
buy insurance for the summer car
return some auto ramps to my in-laws
Could I buy another day?