More progress.
I've been pre-drilling the spikeholes in the ties and aligning some rail . As you can see, I'm dropping a wire for each rail...
since I will have 3 tracks that have to match when I connect the segments, I opted for a simple jig (styrene...). The track spacing is 6cm
The spikes are driven down at an angle (easier to 'post adjust' things this way...). Also make sure the spikes don't 'line up'. They'll split the tie...
When the inner track was done, I had to wire things up and let my good ol' UP Alco PA do a test run
One of the tongues is wired (and locked in position...) to act as a 'big stud' (later it will be polarized using the Tortoise...)
I had to resolder the throwbar and 'inner tongue', widening the gap so that the wheels wouldn't short circuit the whole thing. And I'll be darned! It works!!!
Here one can spot the slider and the wheels. The (Herbert-Herei) studs only reach the top of the rails, so I figure that 2R (DC...) engines/cars will have no problems [

]