Building a Traction Layout

Nazgul

Active Member
Jan 22, 2006
992
0
36
63
Ohio
Chris
I can only imagine the careful work and patience that must go into a layout such as yours. It must, however, make it all the more rewarding to see all of your hard work payoff in such a spectacular way!:thumb: :thumb: Keep up the outstanding work!:) :) :)
 

jetrock

Member
Dec 18, 2003
894
0
16
55
Visit site
Here's a question: How hard is it to manually uncouple cars under wire? I was fiddling around with a Rix pick doing some switching last night and said "geez, if I had overhead I'd be slashing myself to ribbons right now!"
 

interurban

Active Member
Aug 21, 2002
4,407
0
36
76
Pickering. Ontario. Canada.
Visit site
jetrock said:
Here's a question: How hard is it to manually uncouple cars under wire? I was fiddling around with a Rix pick doing some switching last night and said "geez, if I had overhead I'd be slashing myself to ribbons right now!"


Understand that a combine carries freight so do boxmotors, and maybe the odd trailer, It isn`t necessary to uncuple like you would on the main line if that`s your power choice.
The juice jacks would do the big haul and I use the magnets like the mail line would in sidings, also a hands on tooth pick or dentist tool helps too.:D
 

jetrock

Member
Dec 18, 2003
894
0
16
55
Visit site
Ah, there's the rub: I'm modeling a western U.S. electric, which was characterized by heavy juice jacks doing most of the freight work, rather than combines or box motors. I guess I'll just have to learn to get good with the Rix pick, or put down more uncoupling magnets!
 

interurban

Active Member
Aug 21, 2002
4,407
0
36
76
Pickering. Ontario. Canada.
Visit site
It`s been a while since I updated this thread, I can now do so as I am on the last section .
This has been a project on hold until it hit me this week what I wanted to accomplish here.

So in goes the making of a road on a hill.
It is ready for the instafill to be spread in, next will be the scenery up from the rails and down the other side where there is located two portals.

Also there is a business section going in top and bottom.

This will take a while to finish as the overhead has to go in, you may notice I change the track a bit.

Last shots of the town platform
 

Attachments

  • pictures from my new in progress Layout 001.jpg
    pictures from my new in progress Layout 001.jpg
    61.8 KB · Views: 86
  • pictures from my new in progress Layout 002.jpg
    pictures from my new in progress Layout 002.jpg
    63.3 KB · Views: 76
  • pictures from my new in progress Layout 003.jpg
    pictures from my new in progress Layout 003.jpg
    52 KB · Views: 88
  • pictures from my new in progress Layout 004.jpg
    pictures from my new in progress Layout 004.jpg
    63.7 KB · Views: 124
  • pictures from my new in progress Layout 005.jpg
    pictures from my new in progress Layout 005.jpg
    63.5 KB · Views: 108

spitfire

Active Member
Jul 28, 2002
3,448
0
36
75
Toronto, Canada
www.parkdaleyard.com
Looking good Chris!! I assume the two strips I see are to contain the roadway - plaster, right? I see my favourite building in that shot - man it's a nice one!

I can't believe how quickly your layout is coming together. :thumb: :thumb: :thumb:

Mine seems to be taking forever!!

Val
 

MasonJar

It's not rocket surgery
Oct 31, 2002
5,362
0
36
Ottawa, Canada
Visit site
Wow Chris - nice work, and coming along quickly too...!

That 5 story building is fantastic. Looks great following the curve of the road too. Very different than the usual flats or shallow relief background buildings one usualy sees. :thumb:

Andrew
 

interurban

Active Member
Aug 21, 2002
4,407
0
36
76
Pickering. Ontario. Canada.
Visit site
It`s been a while , but here are a few pictures of what I have been doing with the layout.

First a shot coming out of tunnel with the scenery finished.
This is a station I bought already to go great building.
 

Attachments

  • random shots on the new 2Lay Out 001.jpg
    random shots on the new 2Lay Out 001.jpg
    74.7 KB · Views: 90
  • random shots on the new Lay Out 018.jpg
    random shots on the new Lay Out 018.jpg
    47.9 KB · Views: 21

interurban

Active Member
Aug 21, 2002
4,407
0
36
76
Pickering. Ontario. Canada.
Visit site
I bought this saw pit kit of David, and built it last spring when I was of work getting a knee replacement on the right leg.

First a picture building it
Here is the location on the layout.
 

Attachments

  • Copy of random shots on the new Lay Out 059 1.jpg
    Copy of random shots on the new Lay Out 059 1.jpg
    71.2 KB · Views: 21
  • random shots on the new Lay Out 061 1a.jpg
    random shots on the new Lay Out 061 1a.jpg
    31.2 KB · Views: 147
  • random shots on the new Lay Out 063 2.jpg
    random shots on the new Lay Out 063 2.jpg
    54.4 KB · Views: 25
  • random shots on the new Lay Out 068 3.jpg
    random shots on the new Lay Out 068 3.jpg
    62.3 KB · Views: 30
  • random shots on the new Lay Out 070.jpg
    random shots on the new Lay Out 070.jpg
    55.2 KB · Views: 24

interurban

Active Member
Aug 21, 2002
4,407
0
36
76
Pickering. Ontario. Canada.
Visit site
Here she is fitted in and scenery done.

The kit was a dream to build and one can do many things with it re setting up the scene
 

Attachments

  • random shots on the new Lay Out 072.jpg
    random shots on the new Lay Out 072.jpg
    67 KB · Views: 22
  • random shots on the new Lay Out 073.jpg
    random shots on the new Lay Out 073.jpg
    64.6 KB · Views: 24
  • random shots on the new Lay Out 075.jpg
    random shots on the new Lay Out 075.jpg
    70 KB · Views: 19
  • random shots on the new Lay Out 077.jpg
    random shots on the new Lay Out 077.jpg
    71.1 KB · Views: 21
  • random shots on the new Lay Out 082.jpg
    random shots on the new Lay Out 082.jpg
    46.7 KB · Views: 19