Greetings Ladies and gentlemen! It is time again for another update. This is "WALL-2" (this is the "back wall" with the lift, connects to the other bays).
I laminated the both parts on foam-core board.
Here are both parts laid out, to show that they are laminated to foam-core board.
Both sides are sandwiched together, to form a solid piece.
Here are two of the conduits.
Both sets of conduits are attached in place, to the back side of the wall.
Another conduit and a light is attached in place, to the back side of the wall.
Moving on to the lift assembly. The is the backplate/guide for the lift. The parts are laminated on foam-core board.
Here is the lift cabin and the lift connector. The parts are laminated to foam-core board.
The lift cabin and the lift connector are attached to one another!
The lift cabin and the lift connector are connected to the backplate/guide.
Here is the lift booth. The parts are laminated to foam-core board.
The lift assembly is complete.
Here are the fire extinguisher, first-aid kit, and hatchet.
The lift assembly is attached in place on the back of the wall. A conduit, the fire extinguisher, first-aid kit, and hatchet are attached in place on the front of the wall.
The lights and Clackson are attached in place.
The rest of the conduits are attached in place to the front of the wall. This wall is complete.
Please stay tuned to your local Colonial Broadcast Network for further updates as they occur.