This is a 4' x 6' part of what will be a 10' x 11' around three walls. Nothing is glued down, just simply placed for show. The 2 (staging) tracks behind the furnace is where all materials will eventually go. Those lead to the open side of the garage. The 4' section is facing the open end of the garage, and the only real issue is the yard lead track will need one operator on the outside to have better access to the south side, and the other operator if used will be in the center working switches on the north side. The inside track is the main. Currently it is a single track, I'm thinking of making it a double. Access to the yard from south end is from both a facing point & trailing point crossover off to the left (not pictured). However, that interlocking will be unscenicked, and on a 2' x 3' removable lift out. no duck unders! The 4 yard tracks ( 2 inbounds, 2 outbounds) are about 4'-5' each.
Any thoughts? I tried my best not to parallel the edges, and to put some scenery between edges & tracks. The little shack is the commuter train station / amshack. Era is 1980's-present.
Any thoughts? I tried my best not to parallel the edges, and to put some scenery between edges & tracks. The little shack is the commuter train station / amshack. Era is 1980's-present.