N
nachoman
As promised, here is a very crude trackplan for my proposed new layout. It's a 4x8 with both standard and narrow gauge track. The lower oval is standard and dual-gauge. A narrow gauge branch makes a loop and a half before reaching the mining town at the summit. All curves are 18" radius. For the length/type of equipment I am running, this should pose no problems. I plan on handlaying most of the track.
My goals for this trackplan were to depict the Morenci Southern railroad about 1917-1920. The prototype was very steep and winding with many trestles and bridges. The prototype ran between Morenci and Duncan, Arizona.
Here is the plan, I will write more of my ideas later.
Kevin
My goals for this trackplan were to depict the Morenci Southern railroad about 1917-1920. The prototype was very steep and winding with many trestles and bridges. The prototype ran between Morenci and Duncan, Arizona.
Here is the plan, I will write more of my ideas later.
Kevin