Hi all,
It's been awhile since I have posted. Lots of stuff going on here in my personal life which I will post over in the right section.
I have named my layout out krawler Junction and have started design work and have started to buy supplies. Not sure when I will start the bench work but it will be this summer sometime.
On with the description since I can't figure out the cad software*L*. Two benches joined "L shaped", main table is 8' x 32" second bench will be 6' x 32". Actually there will be a third bench but it will be for staging trains with no detail just cork and rail.
Main table will have a saw mill complex at one end and a farm at the other, between will have a stream. 6 feet of the table will have a hill/mountain as the backdrop.
Second table will be a down town area with track in the center of the table dividing the table in half length wise with several industries in the back ground.
Well tracks ahead is about to come on so I will post more in a little bit.
Krawler
It's been awhile since I have posted. Lots of stuff going on here in my personal life which I will post over in the right section.
I have named my layout out krawler Junction and have started design work and have started to buy supplies. Not sure when I will start the bench work but it will be this summer sometime.
On with the description since I can't figure out the cad software*L*. Two benches joined "L shaped", main table is 8' x 32" second bench will be 6' x 32". Actually there will be a third bench but it will be for staging trains with no detail just cork and rail.
Main table will have a saw mill complex at one end and a farm at the other, between will have a stream. 6 feet of the table will have a hill/mountain as the backdrop.
Second table will be a down town area with track in the center of the table dividing the table in half length wise with several industries in the back ground.
Well tracks ahead is about to come on so I will post more in a little bit.
Krawler