Hi there,
I have started construction of my N scale layout.
I made the module tables and started the basic landscaping using styrofoam.
What I was wondering, would I just glue the rails right on the styrofoam, or do I need a cork roadbed.
I guess in reality underneath the track is the balast which makes the track higher. Should I maybe put a layer of balast first, lay the track and then put some extra belast between the ties?
http://vosgames.nl/~takev/trains/land.html
I have started construction of my N scale layout.
I made the module tables and started the basic landscaping using styrofoam.
What I was wondering, would I just glue the rails right on the styrofoam, or do I need a cork roadbed.
I guess in reality underneath the track is the balast which makes the track higher. Should I maybe put a layer of balast first, lay the track and then put some extra belast between the ties?
http://vosgames.nl/~takev/trains/land.html