This last week has been a busy one for me. I had several projects to work on. The first of these was get a Bachmann GP40 body onto an Athearn GP60 frame. While the frame required very little modification the Bachmann body needed quite a bit of surgery. For some reason known only to them, Bachmann had the couplers mounted to the body instead of the frame. The mounting pads for these couplers had to be carefully removed. The mounting tabs that the screws that held the body to the frame also had to be removed. After all this was done it was a simple matter to spread the sides of the body slightly so that it would hold onto the frame through tension. First photo shows how it looked after the body was fitted, second photo shows the unit after painting and light weathering.
The next project was to rebuild some old Bachmann hoppers. These were made for Talgo trucks with truck mounted couplers. I installed new trucks and added body mounted Kadee #5 couplers.
The easiest project was rebuilding an old Mehano caboose. All I had was the caboose body with a useless frame. I pitched the frame (it's now buried under a bunch of plaster) and installed an Athearn frame and a pair of roller bearing trucks with nickel-silver wheels and body mounted Kadee couplers.
After assembly
And after a run through the paint shop.
There were also two gondolas to rebuild. These received Talgo trucks with Kadee couplers.
And lastly, pouring the plaster for the new section. It'll look much better when the scenery goes in.
That's it for this week.


The next project was to rebuild some old Bachmann hoppers. These were made for Talgo trucks with truck mounted couplers. I installed new trucks and added body mounted Kadee #5 couplers.



The easiest project was rebuilding an old Mehano caboose. All I had was the caboose body with a useless frame. I pitched the frame (it's now buried under a bunch of plaster) and installed an Athearn frame and a pair of roller bearing trucks with nickel-silver wheels and body mounted Kadee couplers.
After assembly

And after a run through the paint shop.

There were also two gondolas to rebuild. These received Talgo trucks with Kadee couplers.

And lastly, pouring the plaster for the new section. It'll look much better when the scenery goes in.



That's it for this week.