Good morning folks
I am still gluing pink foam down to fill in gaps around the dioramas.
Time for a reality check; If you were to go the layout or work bench what project or projects are sitting there waiting to be completed/
The layout has a bunch but the current one is the Hillside and Grain Elevator Extension. I have the rock outcroppings and most of the contouring done. However, I may need to begin some of the mountain and one of the spur lines before I can continue.
On the workbench there is a P2K CNJ caboose, an Atlas ARHS Reading two-bay hopper, and a Kadee CNJ covered hopper that I need to finish weathering. I also have some half painted LPP’s. I have two coal loads to make; one for the Atlas hopper and another for a Accurail three-bay CN hopper.
I am still gluing pink foam down to fill in gaps around the dioramas.
Time for a reality check; If you were to go the layout or work bench what project or projects are sitting there waiting to be completed/
The layout has a bunch but the current one is the Hillside and Grain Elevator Extension. I have the rock outcroppings and most of the contouring done. However, I may need to begin some of the mountain and one of the spur lines before I can continue.
On the workbench there is a P2K CNJ caboose, an Atlas ARHS Reading two-bay hopper, and a Kadee CNJ covered hopper that I need to finish weathering. I also have some half painted LPP’s. I have two coal loads to make; one for the Atlas hopper and another for a Accurail three-bay CN hopper.