I've made some progress on the loco service area.
The turntable is installed and operating. All the track is laid and ballasted except where the coal unloading bin will be.
The grade crossings need to be installed, structures finished and mounted and lots of junk and finer details added.
The turntable is installed and operating. All the track is laid and ballasted except where the coal unloading bin will be.
The grade crossings need to be installed, structures finished and mounted and lots of junk and finer details added.