Thanks guys.
I got the track up to the sixth level. There is 420 feet of track in place all ready for the main lines. I am only going up to nine levels 630 feet of total main line tracks. I have one main line for up hill traffic and another main line for down hill traffic. I could either run the layout as a point to point or let the trains run through the reverse loops that are around both the yards for continued running.
There will be 24 sections of straight track for scenes. I am planning on about 4 different cities for the train to pass through. I have a mountian scene, river scene, a siding, 2 city scenes and I just started a station scene. I have plans for a farm scene or cattle ranch, and a plan for a scene with a lake and a camp ground of hobos. That would complete the scenery on the first layer.
The buildings are from kits but the bridges are scratch built. I am going to try and scratch build some of the buildings. The top level is going to be mostly sidings scenes that will be the biggest shelf it will have different types of industries on it.
I am not looking for the operational point of the layout that much. I am more interested in running the trains through different scenery. Even if the train has to deliever goods to a point that is only three sections away on the same level. I would make them take the long way and travel the whole layout.
I am not working alone on this layout that is why it might seem like I am fast. I have two sons that are helping me with the work.
I hope this helps a little with any of the questions you might have for this layout. If you have any questions feel free to ask.