Hi,
Our cofee table layout has progressed to a stage where we need to start making scenery.
I figured a wise place to start would be the tunnel portals...
Are there any NMRA or otherwise regulations that should be followed?
"Just make'em big enough" ?
Could someone measure a commecial tunnel portal for steam/diesel loks so I would have something to go on, please?
Threre will be 3 single track portals and 2 double track portals...
I think we may have gone overboard with the tunnels....
This is our first attempt at model railroading so any advice is welcome.
btw. "we" means me and my wife...
I attach a pic from the mock up of most of the scenery elements, what is missing is the Wineyard/mountain on the right that will enclose the tracks.
Our cofee table layout has progressed to a stage where we need to start making scenery.
I figured a wise place to start would be the tunnel portals...
Are there any NMRA or otherwise regulations that should be followed?
"Just make'em big enough" ?
Could someone measure a commecial tunnel portal for steam/diesel loks so I would have something to go on, please?
Threre will be 3 single track portals and 2 double track portals...
I think we may have gone overboard with the tunnels....
This is our first attempt at model railroading so any advice is welcome.

btw. "we" means me and my wife...
I attach a pic from the mock up of most of the scenery elements, what is missing is the Wineyard/mountain on the right that will enclose the tracks.