I finally started laying track on my switching layout.I only have a small section down but deceided to test my engine.It ran good but I found that I had to apply power to the track that I had the engine on in order for it to run.
On my last layout which was also a switching layout and smaller than this one,all I had to do was apply power to one track and the engine would run everywhere.
Is this due to the fact that all the track is not installed yet?Will I have to run feeder wires in order to get power to all rails? I am using Peco insulfrog switches and noticed that if I run on one track with the switch set for that track there is no problem but if I move the points to the another track the engine won't move. I something causing a short? This makes no sense.Any help will be appreciated. Bob
On my last layout which was also a switching layout and smaller than this one,all I had to do was apply power to one track and the engine would run everywhere.
Is this due to the fact that all the track is not installed yet?Will I have to run feeder wires in order to get power to all rails? I am using Peco insulfrog switches and noticed that if I run on one track with the switch set for that track there is no problem but if I move the points to the another track the engine won't move. I something causing a short? This makes no sense.Any help will be appreciated. Bob
