hi all
i need to work out a way to hide the entrance to staging.
it is at the front of the layout.
i was thinking of using a large factory. with the trains running thru it.
do you think this will work?
or do you have a better idea?
thanks for your help.
Gene
i need to work out a way to hide the entrance to staging.
it is at the front of the layout.
i was thinking of using a large factory. with the trains running thru it.
do you think this will work?
or do you have a better idea?
thanks for your help.
Gene