The benchwork is almost complete and it will soon be time to lay the track.
(My goal is to have trains running by Christmas)
I was wondering if there are any new ways of doing it besides nailing it down with those tiny little spikes with my tiny little hammer that ALWAYS smashes my HUGE fingers?
Any new and simpler ways of laying track? Most will be flextrack code 100 but I do have many turnouts on this new layout (approx. 13)
Thanks...Any suggestions would be appreciated,
(My goal is to have trains running by Christmas)
I was wondering if there are any new ways of doing it besides nailing it down with those tiny little spikes with my tiny little hammer that ALWAYS smashes my HUGE fingers?

Thanks...Any suggestions would be appreciated,