This is a project that I have been wanting to do for a while now.
I bought this structure "as-is" (except for the "Twin River" and NP signage) at a show when I was just starting out 2 1/2 years ago. I thought it looked great!
:gaptooth:....... what was I thinking
.
Believe me, it looks even worse in person!!!!!
This baby need a lot of work. The position of the inner support beam has been changed (probably to work with the previous owner's track spacing). Unfortunately it interferes with the coal chute opening. That must be fixed. And of course, putting the slack loader on the roof is problematic at best:cry:
. Whether or not I can remove the problem areas and re-work them without destroying the model, remains to be seen.
Regardless, Lots of work...Lots of paint!
I bought a new "New River Mining Co" a while back and did a kitbash of it just like "Turtle Creek Coal":
http://trains.com/mrr/default.aspx?c=a&id=1206
Here's my version:
Since it was smaller than the orginal...I have a few parts left over that I may be able to use on this project.........
I hope to get started over the weekend :winker:
Take care
I bought this structure "as-is" (except for the "Twin River" and NP signage) at a show when I was just starting out 2 1/2 years ago. I thought it looked great!





Believe me, it looks even worse in person!!!!!
This baby need a lot of work. The position of the inner support beam has been changed (probably to work with the previous owner's track spacing). Unfortunately it interferes with the coal chute opening. That must be fixed. And of course, putting the slack loader on the roof is problematic at best:cry:

Regardless, Lots of work...Lots of paint!
I bought a new "New River Mining Co" a while back and did a kitbash of it just like "Turtle Creek Coal":
http://trains.com/mrr/default.aspx?c=a&id=1206
Here's my version:

Since it was smaller than the orginal...I have a few parts left over that I may be able to use on this project.........
I hope to get started over the weekend :winker:
Take care
