On my switching layout I have a team track.The track itself is rather long,approx 36".My thinking behind this was to have a number of spots along the track for unloading various types of cars and adding more switching possibilities.There is room for an overhead crane for unloading gondolas,a platform for box cars,tank cars for my oil company and possibly a coal dump for a small coal distributor.
What I would like is some input as the weather this is possible or too much for one track.If that's the case the track can be shortened.
Thanks in advance-Bob
What I would like is some input as the weather this is possible or too much for one track.If that's the case the track can be shortened.
Thanks in advance-Bob
