Those that have followed my posts know I'm working on the right "leg" of my L-shaped layout. The right side of the leg is pretty much done with the tobacco farm and the main drag into Tellico Gap. On the left is the mtn., furniture factory and engine house. That leaves the middle. I built a little bit of a rolling hill and will put row houses on it. Along the road down by the tracks there will probably be a run-down diner. I still have 5 more row houses to build which I'm not looking forward to as I hate to build more than one of anything
! Anyway this is the progress???
so far such as it is. Can I get credit for at least hydro-seeding most of the spackling compound and stryofoam?





