hello everyone, i have a small problem.....im trying to get my double cross-over to accomodate the track leads in the pictures. the part of my layout your looking at is my lift out section. i need to connect all tracks in the pictures. the reason i need to do this is because i got tired of not being able to close my door. so i finally cut the rails for the lift-out. now im stumpped as how to connect all rails. as you can see there is a total of three rails that need to be connected. does anyone have any ideas? i dont have much property to use on the lift-out, but i still need to connect somehow. all you track wizards out there...... i need your help. thanks for all your help!
