Thanks to all the feedback from everyone on my previous thread I have decided not to try to combine switching and classification - duh! So, I've moved classification to the other side of the layout, where it will double as staging. Now I am free to concentrate on serving these busy industries. Incoming loads will be mainly sheet steel and grain, but with the shipping terminal I can bring in just about anything I want. Outgoing will be manufactured goods - appliances and farm machinery, and empties.
The crossovers will have double slip switches. (grid is 12")
cheers
Val
The crossovers will have double slip switches. (grid is 12")
cheers
