Here is the current track plan for my proposed Pulp and Paper Mill at Ottertail. (I'm sure it will change by the time I start laying the track!) I might have an operating session over the holidays, and then start building the bechwork for it after that. I figure the mill should get about 15-20 cars a day, enough work to keep a crew busy durring an op session. The mill buildings will be mostly flats or about 2 inches thick along the backdrop, ( the right side of the track plan) The aisle is on the left side, or the outside of the curve.
