Havn't updated this thread in a little while, here are some things that I have done in the last couple of weeks.
I have done so much stuff with the layout.
- I now have 8 engines. I got some polly scale CNW Green paint and started painting the handrails on the 4 units.
- I built and installed the Bulk Transfer Conveyor at the Hoffa Cement Complex.
- I built and set the Tank Car Oil Loading Platforms in place and got the Track down and ballasted for the loading racks.
- I built and set the Tank Truck Loading Rack in place and ballasted around it.
- I added a wood fence to the front of the oil refinery area and added a gate.
- I built the Guard Gate for the Oil and Flour Mill Complexes.
- I glued some more track down; over by the Glacier Gravel Company and the New River Mining Company
- I built the small extention for the Asphalt Complex that is over by the New River Mining Company and layed foam down. I also added a siding on the new extention.
- I made some grade crossings for the main road over the main line over by Glacier Gravel Company.
And working on some more stuff too.
I don't have any pics at the moment
but hope to have them soon.:thumb: :thumb: