Hello everyone...
Sometime in the new year, construction will begin on a new house, and some real estate has been appropriated... err, leased... for the dream layout in the basement. I negotiated a 14' x 34' area
.
The layout will be freelanced and be set in the transition era... so I kept the curves 20" and larger - "N" scale.
Here's the lower level. No industry tracks have been put in place yet, and nothing is set in stone.
Wonderful site you have here - Lot's of great ideas and information.
-- Mike
Link to large pic
http://i123.photobucket.com/albums/o285/mttrain/LowerLevelSnap.jpg
Sometime in the new year, construction will begin on a new house, and some real estate has been appropriated... err, leased... for the dream layout in the basement. I negotiated a 14' x 34' area

The layout will be freelanced and be set in the transition era... so I kept the curves 20" and larger - "N" scale.
Here's the lower level. No industry tracks have been put in place yet, and nothing is set in stone.
Wonderful site you have here - Lot's of great ideas and information.
-- Mike

Link to large pic
http://i123.photobucket.com/albums/o285/mttrain/LowerLevelSnap.jpg