
Green_elite_cab,
I was thinking and before i assembled them, i painted them right after I cut the pieces off the plastic trees. Everything on both buildings was painted before assembly this time. With my other buildings, I had assembled them and then painted them but found this to be a lot harder and I can see why everyone paints before them put em' together, It makes it so much easyer.

Miles,
Well since I made the glacier gravel company the same way Walthers tells you to and this is the way we put it into the track plan, then perfect.
The ADM is not going to be on my main layout though, it will be on the 6' x 2' module along with 2 more ADM grain buildings, Red wing flour mill, petersons tool specialties, and some scratch built buildings.