Hi..
I have been planning a new layout which has 3 staging areas, North (3 Tracks), South (4 Tracks) and East (2 Tracks) But now I need a hand working out the main yard (12' Long).
Here a rough image of what the layout will be.
So trains will run North-South, South-North, South-East and East to South. But anything going North-East will have to be droped off and picked up by a South-East train.
Now the problem is to desgn a Interchange yard that will work plus have a few Industries so I can swithing.
So idf you could help please do.
Thanks
Auzze
I have been planning a new layout which has 3 staging areas, North (3 Tracks), South (4 Tracks) and East (2 Tracks) But now I need a hand working out the main yard (12' Long).
Here a rough image of what the layout will be.

So trains will run North-South, South-North, South-East and East to South. But anything going North-East will have to be droped off and picked up by a South-East train.
Now the problem is to desgn a Interchange yard that will work plus have a few Industries so I can swithing.
So idf you could help please do.
Thanks
Auzze