Quick Update:
This is my VERY FIRST layout FYI.
I have never soldered or used flex track or anything!
Well I used bachmann ez track under my bed and around the x-mas tree on DC, but thats it.
MAN I LEARNED A LOT AND IT WAS FUN!!!!





Man I had a crazy messy garage. I moved stuff around to allow room for my table. I got some cheap legs as you can see but they word.
Cheap folding legs, that is... lol
Its 4x8 btw...
I dont currently have a picture but I will show my wiring and soldering of feeders tomorrow. I am done with wiring of those. I think my next step is to wire up my switch control box's to my under table switch machines. That will be fun! lol...
I cant wait to start my scenery!!!
My Zephyr is on the way...
MAN THIS IS MY FIRST LAYOUT EVER AND IM SO EXCITED!!!
balloon6balloon6balloon6
UPDATE:
3/16/07


This is my VERY FIRST layout FYI.
I have never soldered or used flex track or anything!
Well I used bachmann ez track under my bed and around the x-mas tree on DC, but thats it.
MAN I LEARNED A LOT AND IT WAS FUN!!!!





Man I had a crazy messy garage. I moved stuff around to allow room for my table. I got some cheap legs as you can see but they word.
Cheap folding legs, that is... lol
Its 4x8 btw...
I dont currently have a picture but I will show my wiring and soldering of feeders tomorrow. I am done with wiring of those. I think my next step is to wire up my switch control box's to my under table switch machines. That will be fun! lol...
I cant wait to start my scenery!!!
My Zephyr is on the way...
MAN THIS IS MY FIRST LAYOUT EVER AND IM SO EXCITED!!!
balloon6balloon6balloon6
UPDATE:
3/16/07

