Now that the river scene is pretty much done, it's time to connect the track on the trestle to the tracks that connect to the main on the Garfield branch. This requires about 8' of street running trackage. I've just finished laying the rail, going to start on the structures now. The blacktop for the streets will come later, after running for awhile to ensure no problems. Here is the bridge bringing the rails to the street intersection.