Biased turkey said:
People in Ontario are very cheap. Here in Québec a "pure" rubbing alcohol is 70%.
You're right about that: I'm so cheap, I don't use alcohol at all, well, at least not for the train layout.

However, part of the reason that some people have problems with ballasting is that they tend, for whatever reason, to skimp on materials. I use white glue thinned 50/50 with hot tap water (mixes faster), and water with a couple drops of dish detergent added as my "wetting" agent. If you have a slope that is so steep that the scenic material or ballast rolls off it, precoat the area with full-strength white glue. I use a 1" paint brush to apply it: being cheap, I make sure to wash it out after using, but you can also buy cheap throw-away brushes that will also work. I spread the ballast material and/or ground foam from paper cup and, in the case of ballast, use a 3/4" soft brush to spread it around to where I want it. Don't skimp on the ballast: if it rolls down the slope of the roadbed, add more until it stays where you want it. It's not really that expensive, and it'll improve the look of your roadbed. When you've got everything where you want it, flip that soft brush around, lightly grasping the ferrule between your thumb and forefinger, and with the handle laying across the rails, lightly and rapidly tap the handle with the fingers of your free hand, all the while moving the brush along the track. All of the loose ballast that's laying on the tie tops will "magically" bounce to where it should be. If the area that you're ballasting includes any turnouts, apply a bit of plastic-compatable oil to the tie tops over which the point rails move, then park the points in a mid-throw position.
Now, using a good quality sprayer, capable of producing a fine mist, thoroughly wet the area. Start by spraying upward and letting the droplets fall onto the area until it is dampened. If you skip this step, you risk disturbing the scenic material with the force of the spray, and it 's not much fun to try to re-arrange wet scenic foam or ballast. When the area has been dampened, you can spray more directly. Thoroughly wet the scene: the thicker you've applied the scenic material, the more "wet" water is needed. You need to get it right down to the hardshell/foam/roadbed, or you'll end up with the glue mixture forming a crust on top, which is not bonded to the layout. You will find, on areas where the ballast is quite deep, that water will pool in low-lying areas, a sign that you've applied enough wetting agent. This step is as important as applying the glue mixture if you want to achieve a good bond.
I use a plastic glue bottle to apply the glue mixture. It has a fairly small opening that allows the liquid glue to come out in drops, or in a stream, if I squeeze the bottle. Don't skimp on the glue. I used to use thinned matte medium, but for the price of two small bottles of the stuff, you can buy a gallon of white glue which works just as well. Because you've thoroughly soaked the area, those droplets of glue will spread readily throughout the landscaping material. Again, on thick areas, the glue mixture will pool in low spots. Don't worry about it: once the water evaporates, there'll be little residue left.
Work in a pattern to ballast track. I usually work down the centre of the track, then go back and do each side in turn. Because of the run-off problem noted above, I usually do the trackside ground cover at the same time. When you've saturated the scene with glue, clean up your tools, and go do something else for a day or two. Scenery is like a pimple: if you keep fiddling with it, it'll get uglier.
When the glue has finally dried, clean your track in the area. I find that there's not much in the way of glue on the railheads (the trains seem to run fine), but the tops of the rails are somewhat discoloured. Also check those turnouts to make sure that the points aren't glued to the ties in spite of the application of oil. A little back-and-forth action with your finger should free up any problem areas.
On track with not too many turnouts, and fairly flat terrain close to the tracks, you should be able to do at least 15' or 20' of track in a couple of hours or less.
Sorry for using an old picture, but the scenery elements around the track, including the ballast, sub-ballast (cinders), and rip-rap are over an inch deep in some places, all firmly fixed in place.
Wayne