Just a thought - if you really want a longer mainline, you could make an oval-shaped helix where the taconite plant is in your plan, and then go up to a second level and have an ore/taconite loading area there. Of course as an iron ore modeller myself, I know long ore trains and grades don't work too well together, but with a 2-3 diesels on the train it could work.