Hello all,
I've started with my On30-project, to build a small layout to run my Bachmann-Shay.
Last days, I've nailed 12' of track and 3 turnouts. The rails are handlaid on wooden ties.
Here are some features, that will be in the layout when it's finished :
- standard-/narrowgauge interchange to load logs
- a piece of dualgauge track
- logging camp with bunkhouses
- supply yard for shay (sand, firewood, water)
- turntable
- ...
Curves are around 350mm radius (14 '').
Here are the first pictures. The layout ist 4' by 1' 3 3/4 ''.
I've started with my On30-project, to build a small layout to run my Bachmann-Shay.
Last days, I've nailed 12' of track and 3 turnouts. The rails are handlaid on wooden ties.
Here are some features, that will be in the layout when it's finished :
- standard-/narrowgauge interchange to load logs
- a piece of dualgauge track
- logging camp with bunkhouses
- supply yard for shay (sand, firewood, water)
- turntable
- ...
Curves are around 350mm radius (14 '').
Here are the first pictures. The layout ist 4' by 1' 3 3/4 ''.

