I am happy to report that all my mainline track is now laid
I originally bought 50 three foot sections of flex track. I tried to be very careful in not wasting any of it and it was a good thing as I needed the last one to complete this part of the process. So, I have something in the neighborhood of 145 feet of mainline, not including 16 turnouts and three crossovers.
What is very interesting to me is when I hooked up the power to just one of the seven drops I have for the mainlines I was able to power a loco all of the way around the layout. It slows down in spots, but I obviously have track integrity all the way around and also down a spur.
Now to get started on the yards, of which there are three. Shall I tackle the easiest or the most difficult first
And the fun continues
Bob

What is very interesting to me is when I hooked up the power to just one of the seven drops I have for the mainlines I was able to power a loco all of the way around the layout. It slows down in spots, but I obviously have track integrity all the way around and also down a spur.
Now to get started on the yards, of which there are three. Shall I tackle the easiest or the most difficult first

And the fun continues



Bob