Could someone smarter than me (don't all speak up at once!) give this a look and let me know if I'm on the right track with respect to wiring?
Thnx, Bill
Notes:
1) Turnouts are Peco Electrofrog.
2) Blue dots are feeders to the rails.
3) Red lines are insulated rail joiners.
4) The stub at B doesn't need to be isolated right now, but is planned to be a part of a reverse loop in the future.
5) Only one set of feeders is shown for the loop, but I plan to add feeders to each piece of flex track in the loop.
Questions:
1) Is this right? Have I missed anything?
2) The insulated rail joiners will, for the most part, be at the end of turnouts. Is this a problem?
3) The feeders at point A will probably need to made by soldering them to the rail joiners connecting the two turnouts. I don't plan on soldering joiners to the turnouts so they can be removed more easily. Is this a problem?
Thnx, Bill
Notes:
1) Turnouts are Peco Electrofrog.
2) Blue dots are feeders to the rails.
3) Red lines are insulated rail joiners.
4) The stub at B doesn't need to be isolated right now, but is planned to be a part of a reverse loop in the future.
5) Only one set of feeders is shown for the loop, but I plan to add feeders to each piece of flex track in the loop.
Questions:
1) Is this right? Have I missed anything?
2) The insulated rail joiners will, for the most part, be at the end of turnouts. Is this a problem?
3) The feeders at point A will probably need to made by soldering them to the rail joiners connecting the two turnouts. I don't plan on soldering joiners to the turnouts so they can be removed more easily. Is this a problem?