My Dad and I have been building a layout for the past 6 months and here's a very short progress report of what has happened. It's in a space of 13'x16', and is based off of a John Armstrong plan "The PRR, Schuylkill Division".
The First shot is of the very beginning stages of construction... the backdrop. 9/20/06
View attachment 36571
Here my Dad is screwin' the whole thing up (phillips head that is).
I mean he's building some bench-work. 11/23/06
View attachment 36572
This is the Bench work basics. 12/07/06
View attachment 36573
And finally, let's jump ahead a few months... This is the latest track work I did on Thursday. It's the upper level main yard. 4/12/07
View attachment 36574
As you can see we got a fair amount of stuff done in 6 months, while working sparingly on it. I live 2 hours away from him and work and go to school, so my time is limited. (who's isn't right?). But when I do get down there I make the most of the trip, usually working a full 8-10hr day on it before I have to leave.
To see a full progress report on it from the beginning go to (Link deleted-admin)
That should tell you the whole story.
I also have all my videos on Youtube.com http://youtube.com/watch?v=NKy4TGPMofU Click on the tab to the right of the videos that says "More from this user" to see all my vids.
Thanks for looking and will update periodically.
The First shot is of the very beginning stages of construction... the backdrop. 9/20/06
View attachment 36571
Here my Dad is screwin' the whole thing up (phillips head that is).

View attachment 36572
This is the Bench work basics. 12/07/06
View attachment 36573
And finally, let's jump ahead a few months... This is the latest track work I did on Thursday. It's the upper level main yard. 4/12/07
View attachment 36574
As you can see we got a fair amount of stuff done in 6 months, while working sparingly on it. I live 2 hours away from him and work and go to school, so my time is limited. (who's isn't right?). But when I do get down there I make the most of the trip, usually working a full 8-10hr day on it before I have to leave.
To see a full progress report on it from the beginning go to (Link deleted-admin)
That should tell you the whole story.
I also have all my videos on Youtube.com http://youtube.com/watch?v=NKy4TGPMofU Click on the tab to the right of the videos that says "More from this user" to see all my vids.
Thanks for looking and will update periodically.