
Again... Suggestions from the pros are welcome and I would like to know if the incline of 8 inches in 8feet will work with small logging load
Thanks
That's 8.3%. I don't think anything other than a geared loco will pull anything up that.I made my own foam inclines and the grade is huge I go up 8 inches in 8 feet hope I can get trains up it..
That's 8.3%. I don't think anything other than a geared loco will pull anything up that.
Do you have a trackplan we can look at? Sometimes you can raise or lower another area to lessen the grade.
Loren
8.3% is one hell of a grade.i didnt even think a shay could climb that by itself.and if you didnt want to modify your trestle,just make the gorge go down into the baes layer of foam and make it just a deeper gorge.--josh
OK,i got some plans.here is what your old trestle/gorge looks like to me.your gorge is on top of the base foam,why not "dig" down into the base to lower the overallheight but stillbe dramatic and keep your trestle
old:
![]()
new:
![]()
yes i realize the name is wrong but this was quick,so dont burn mei hope i could help.--josh
Hi,
Did you think of a switch back, great way to get height with little effort?
Bob
Where you wrote "gorge" is that the problem? And is that inside and outside loops of track you have? And are they connected? Sorry for all the questions but I can not tell much from your drawing.
Loren