I'm having a problem getting from completed benchwork to track laying phase. I have my L-girder tables built without joists at this point.
Here are the questions I need help with:
1. Do I secure joists every 16" at this point or is this done on a custom basis for each section of track?
2. Do I cover the entire layout with plywood, pre-lay track, cut subroadbed with jig saw and then attach cut pieces to risers?
Not sure how to proceed into track laying.
Any insight would be helpful as most websites do not mention any details on this step.
Track plan can be viewed at http://trains.acsipc.com/third_layout.htm
Thanks in advance...
Shlitz
Here are the questions I need help with:
1. Do I secure joists every 16" at this point or is this done on a custom basis for each section of track?
2. Do I cover the entire layout with plywood, pre-lay track, cut subroadbed with jig saw and then attach cut pieces to risers?
Not sure how to proceed into track laying.
Any insight would be helpful as most websites do not mention any details on this step.
Track plan can be viewed at http://trains.acsipc.com/third_layout.htm
Thanks in advance...
Shlitz
