Here are a few of her finished.
![]()
Pulling 15 cars up 1.5 grade.
![]()
My crummy smoke job.
![]()
Mike
Cheetah , There is no drop off under the trestle but there is a flat canyon going under it with a mine track passing under it.
Thanks , Mike
Cheetah , The trestle is actually at the highest point on the railroad (9 3/4") above ground zero . After a train passes that trestle in that direction it goes into a tunnel and decends the 9 3/4" to zero elevation and the town of Valle Rojo. It then goes into the hidden staging and once out of staging it starts the long journey up hill to Sandia Peak once again.
Thanks , Mike
Cheetah , The trestle is actually at the highest point on the railroad (9 3/4") above ground zero . After a train passes that trestle in that direction it goes into a tunnel and decends the 9 3/4" to zero elevation and the town of Valle Rojo. It then goes into the hidden staging and once out of staging it starts the long journey up hill to Sandia Peak once again.
Thanks , Mike
Fifer,
so you have your train going across the tressel....
than thru the tunnel and declines around the track/bend.... 9 3/4" ????
That much of a drop can be done?????