We had a very busy and productive weekend for once. I got the ceiling painted in the kitchen and breakfast nook. I started taking the air conditioners out of the windows. I have two out of four done so far. We had two football games this weekend; the Drexel Hill Raiders Pee Wee AA team defeated the Colwyn Comets 13-6 while the AAA squad lost to Colywn 13-0.
Even modeling I had a good weekend. I finished assembling three gondola kits and weathering the trucks and wheels; one Erie MDC/Roundhouse, one Frisco Bev-Bel/Athearn, and one Frisco P2K. Those P2K kits are tough with all the grab irons and stuff. I broke a couple and lost one or two. I also weathered the trucks and wheels on two Walthers gondolas.
First is a Walthers RTR gondola with weathered trucks and wheels.
Another Walthers gon.
Next is the P2K drop end mill gondola
Here is the MDC/Roundhouse gondola
And lastly Bev-Bel/Athearn gondola
Next step is to weather them.
Even modeling I had a good weekend. I finished assembling three gondola kits and weathering the trucks and wheels; one Erie MDC/Roundhouse, one Frisco Bev-Bel/Athearn, and one Frisco P2K. Those P2K kits are tough with all the grab irons and stuff. I broke a couple and lost one or two. I also weathered the trucks and wheels on two Walthers gondolas.
First is a Walthers RTR gondola with weathered trucks and wheels.

Another Walthers gon.

Next is the P2K drop end mill gondola

Here is the MDC/Roundhouse gondola

And lastly Bev-Bel/Athearn gondola

Next step is to weather them.