
I'll be referencing points in this plan according to the grids:
1 2 3 4 5 6
A
B
C
My track plan is the Scenic and Relaxed, and will be pretty much as shown here. Instead of a 3x6 however, mine is 4x6...to allow for more scenery. I won't be using that much water either. It looks like this picture shows a small logging operation at the bottom left, but I don't want that type of industry. Which leads me to my questions:
1) How many industries can I safely fit on something this size? I definitely want a small town area where shown. I already have a small grain/feed store that will be on one of the spurs there. Near B-5.
2) Grain is definitely a must. I love covered hoppers, so an elevator will be on here somewhere for sure. Since the feed store is in town, the elevator will probably be one of the buildings shown at A-1 or B-1.
3) I'd really like a coal mine, like the Walther's New River Mining Co. But I don't think it would fit anywhere on this track plan. It's a 2-3 track industry, and the only place it might fit is at A-4...but I doubt it. Even then, getting the scenery right for the shaft would be tricky if possible at all.
4) I'm not too partial to tank cars, so I'd like to avoid industries that involve them if possible. Though I do really like the Interstate Fuel & Oil structure, so I'm not ruling it out completely.
Need some input!