Here it is, my layout is the last 18 miles of the Northern Branch of the Credit Valley Railway.
The branch line totaled 35 miles, from Streetsville to Orangeville.
There was a 27 mile sub branch from Cataract to Elora.
The mainline was 121 miles, that covered Toronto to St. Thomas, Ontario.
With a total of 183 miles total The Credit Valley Railway truly was a Short Line.
My freelanced road (Wauseon & Norwalk Railroad) constructed everything in green, west of Freemont. From there east, it shares trackage with NKP. My road also has a trackage agreement with NKP, allowing travel over most of the blue lines. An agreement with NYC gives an alternate route into Toledo, which is shown in yellow. DT&I is highlighted in orange, and is just a reference.