I finally got a chance to work on the trackplan again.
Here is the starting of the 2nd level:
Benchwork with helix and starting the mainline. Mainline branches off to both sides of layout for continuous running.
This one shows the mainline for the 2nd level
Here is the Glacier Gravel Company (http://walthers.com/exec/productinfo/933-3062) and open mine area. There is a conveyor that goes from the bottom of the mine to the top of the crushing house and another conveyor for the trucks to dump into from the top of the mine. There are 2 tracks that serve this mine. The dark brown lines are the mine cliff faces simulating the excavation of the mine walls.
This one just shows the chain-link fence and the large gate around infront of the mine area
This shows the New River Mining Company (http://walthers.com/exec/productinfo/933-3017) and the Western Coal Flood Loader (http://walthers.com/exec/productinfo/933-3089) Mine. This was a bit hard to find an area for track to be laid to serve the mine but I had to start all the way on the opposite side of the layout. The siding leaves the mainline and starts to go down below the tabel and just above the staging area. There is a #4 switch that branches one track off to the coal loader and the other to the main building which later becomes 2 tracks. The faded brown represents undertable track and the darker brown track is were it becomes visable again
The dark brown marks are the rough layout of were the underground mines would be if I decide to them.
Here is the starting of the 2nd level:

Benchwork with helix and starting the mainline. Mainline branches off to both sides of layout for continuous running.

This one shows the mainline for the 2nd level

Here is the Glacier Gravel Company (http://walthers.com/exec/productinfo/933-3062) and open mine area. There is a conveyor that goes from the bottom of the mine to the top of the crushing house and another conveyor for the trucks to dump into from the top of the mine. There are 2 tracks that serve this mine. The dark brown lines are the mine cliff faces simulating the excavation of the mine walls.

This one just shows the chain-link fence and the large gate around infront of the mine area

This shows the New River Mining Company (http://walthers.com/exec/productinfo/933-3017) and the Western Coal Flood Loader (http://walthers.com/exec/productinfo/933-3089) Mine. This was a bit hard to find an area for track to be laid to serve the mine but I had to start all the way on the opposite side of the layout. The siding leaves the mainline and starts to go down below the tabel and just above the staging area. There is a #4 switch that branches one track off to the coal loader and the other to the main building which later becomes 2 tracks. The faded brown represents undertable track and the darker brown track is were it becomes visable again

The dark brown marks are the rough layout of were the underground mines would be if I decide to them.