Hi Lester and gang.
All is going well here just very busy with family and work.
We have made some very good progress with the layout.
Bench work is finished (for now:thumb: ) and about 75% of the track is temporarily down.
We even built a foam mountain that is about nine feet long , we then brought in the dynamite crew to blast a path through it so we could lay some track .
My kids loved that part we had pink foam everywere.
I have been doccumenting everything with photos so when I get a chance I will post it as a newbies first attempt at MRR

ops: .
We have decided on a modern theme and are now looking at buildings to suit before we can finish the track laying.
My large yard is temporarily on hold until a good part of this layout is complete I will then add an addition to one end forming a large L shape and use it for my yard.
what is a decent length yard for a 12X4.6 layout ?
I have been reading a lot trying to learn as much as I can , plus I am still very nervous about the plaster part of the mountain.
Are you sure there are no pink mountains anywere ?

.
Well back to the books.
Thanks for your interest Lester
Tim K